Share This

Showing posts with label Board of Engineers Malaysia (BEM).. Show all posts
Showing posts with label Board of Engineers Malaysia (BEM).. Show all posts

Saturday, July 15, 2017

Stop denying the undeniable high engineering consultancy fees for 3 Penang roads, says minister

The works minister, Datuk Seri Fadillah Yosof says compared to what the JKR recently paid for pre-construction consulting fees for a project in Johor (RM19mil of pre-construction consulting cost represents 2.67% of RM718,570,500 for roads totalling 30km in length), the Penang government's consultancy fees for the three roads project is exorbitant to the total RM220mil pre-construction fees that was already fully paid by the Penang government, which represented 11.06% of the RM1.99bil construction cost for the three roads totalling 20km in length and has yet to start construction despite a three-and-a-half-year delay.” 


PETALING JAYA: The Penang government has been urged to “stop denying the undeniable” over the exorbitant consultancy fees for the three roads project.

Works Minister Fadillah Yusof said the Public Works Depart­­ment (JKR) recently paid RM19 million in total for pre-construction consulting fees for a paired road highway project in Jo­­hor.

He compared this with the exorbitant consultancy fees for the three roads project in Penang.

“The fees comprise all required services and include the fees for all surveys, soil investigation, preliminary environmental impact assessment and all civil, structural, electrical and mechanical designs,” The Star quoted Fadillah as saying.

He said the RM19 million of pre-construction consulting cost represents 2.67% of RM718,570,500 for roads totalling 30km in length.

He added that in accordance with the Board of Engineers Malaysia’s (BEM) guidelines, not all of the fees for the project were paid before construction began as a quarter of the payment was withheld for the tendering and construction stages.


“Compare this to the total RM220 million pre-construction fees that was already fully paid by the Penang government, which represented 11.06% of the RM1.99 billion construction cost for the three roads totalling 20km in length and has yet to start construction despite a three-and-a-half-year delay,” Fadillah said.

The three paired roads are meant to be the traffic dispersal system of Penang’s proposed undersea tunnel project.

The cost of the consultation fees for the three paired roads has been a point of contention between the state and federal government, whereby the latter says that the Penang government has significantly overpaid the fees.

The Penang government has maintained that the fees paid is not excessive. - FMT news, The Star

Related Links:

Stop denying the undeniable, says Fadillah - Nation

 

Parti Cinta hands 'evidence' of graft to MACC over tunnel project - Nation 

 

PCM lodges report over Penang undersea tunnel project - Nation ...

 

Party plans to renew MACC report on Penang undersea tunnel project ...

 

BNSC: Firm given Penang Tunnel project 'undercapitalised' - Nation ...

 

Penang Undersea Tunnel - Wikipedia

 

CM: Penang undersea tunnel feasibility study can't proceed | Free ...

 

Bumpy road ahead for CZBUCG's RM6.3b project - The Edge Property

 

Auditors qualify opinion on accounts of firm tasked with Penang tunnel ...

 

Gerakan questions 'high profits' of tunnel feasibility study contractor ...

 

PDF]PENANG MAJOR PROJECTS PRESENTATION - ENGLISH ...

 

Making the corrupt fear whistleblowers - The Star Says

 

Related post:

 

Dismayed over the exorbitant engineering consultancy fees, 4 times higher ! 

Thursday, June 22, 2017

Dismayed over the exorbitant engineering consultancy fees, 4 times higher !


GEORGE TOWN: Barisan Nasional leaders have criticised the Penang Government for allegedly over-paying, by four times, the detailed design fees of three road projects.

“Construction is not a new industry. Many people are puzzled by the exorbitant consultancy fees,” said Penang MCA secretary Tang Heap Seng in a press statement yesterday.

He said the Board of Engineers Malaysia (BEM) devised a standardised gazetted scale of fees for professional engineering consultancy in accordance with Section 4(1)(d) of the Registration of Engineers Act 1967 (Act 138), and it was highly irregular to deviate from it.


Yesterday, it was reported that Barisan’s strategic communication team sought the professional opinion of BEM on the costing of the three paired roads.

The board was said to have replied that the RM177mil in detailed design costs was four times higher than the maximum allowed under the gazetted scale of fees, which the board calculated to be RM41mil.

The three roads are from Teluk Bahang to Tanjung Bungah, Air Itam to Tun Dr Lim Chong Eu Expressway and Gurney Drive to the expressway. They are meant to be a traffic dispersal system for the proposed Penang Undersea Tunnel.


Penang MCA Youth chief Datuk Michael Lee Beng Seng also issued a statement, pointing out that the alleged overpaid amount of RM136mil was more than the reported RM100mil the state spent on flood mitigation in the last eight years.

“We are shocked that the Penang government has put the well-being and safety of the rakyat behind the interests of consultants and contractors.”

Gerakan vice-president Datuk Dr Dominic Lau highlighted that affordable housing, flash floods and landslides were issues that concerned Penangites.

On Tuesday, Barisan strategic communications director Datuk Seri Abdul Rahman Dahlan announced that he was giving the Penang Government a week to explain BEM’s findings, failing which the matter would be referred to the Malaysian Anti-Corruption Commission.

When asked to comment, Penang Chief Minister Lim Guan Eng replied: “Another day.” - The Star


Related Links

MCA division slams state over constant flood woes - Community


Barisan team maintains that Penang govt overpaid consultation fees ...


Chow: No truth to bloated fee claim - Nation | The Star Online

Saturday, October 15, 2016

Sabah's watergate scandal unfolds, engineers nabbed, civil service back in vogue

 

Sabah's watergate scandal unfolds


THE amount involved in Sabah’s watergate scandal is unbelievable.

The Malaysian Anti-Corruption Commission (MACC) seized RM114mil worth of assets –RM53.7mil in cold cash stashed in houses and office – from two senior Sabah Water Department officials on Oct 4.

The duo were investigated for alleged abuse of power and money laundering linked to contracts for RM3.3bil federal-funded projects channelled to the department since 2010. Two others – a Datuk businessman who is a brother of one of the officials and an accountant – were also arrested.

Six days later, MACC traced RM30mil stashed in foreign banks and another RM30mil in 127 land titles for housing, agriculture and commercial.

That’s not all.

MACC also seized nine vehicles worth RM2.7mil, an assortment of jewellery worth RM3.64mil and designer handbags worth RM500,000.

The following Tuesday (Oct 11), three Sabah Water Department employees “voluntarily” surrendered about RM1mil allegedly taken in the process of approving water projects under the RM3.3bil federal allocations.

When you go out of the state capital, you’ll find Sabahans depending on rivers, streams, ponds, wells or rain for their daily needs.

What do we tell M. R., a 34-year-old Rungus housewife from Kampung Bongkok in Pitas, about the Sabah Watergate?

Since she was born, she has relied on wells, rivers or ponds in the jungle to bathe, wash clothes and dishes, and on rainwater for drinking and cooking. Daily, she has to walk a few kilometres to carry 10 litres of water back to her house.

Her water woes worsen when there is no rain for weeks.

“The villagers will be suffering, especially getting water for drinking and cooking,” she said.

“What’s your comment on the Sabah watergate?” I asked.

“That’s what is heartbreaking. We have been asking for piped water for our village. But the excuse they give to us is the source of treated water in Pitas town is about 28km from our village,” she said.

“If the funds meant for water projects were used properly, we would have clean water supply for which we have waited for many decades.”

What do we tell M. J., a 37-year-old Bisayah civil servant from Kampung Sukai in Beaufort about the Sabah watergate?

There is a water pipe that runs through M. J.’s village. However, no water flows in the pipes and yet the villagers are billed for it.

“The pipes were installed in 2010. We had water for about one year and then it went dry, maybe because of leakage,” he said.

Now many villagers rely on the blue water tank they got during elections.

“When there is no rain, some of the villagers have to buy water from a town about 30km away for drinking and cooking,” he said.

“For other uses, the villagers get murky water from wells and a polluted river along a mangrove swamp.”

“What’s your comment on the Sabah watergate?” I asked.

“As a true Sabah-born I’m extremely disappointed. The people’s first call is not delivered because of greed. If only a portion of the money were distributed, the villagers would not be thirsty for the promises made by politicians.”

What do we tell N.V. H., a 49-year-old Chinese businessman from a suburb in Tawau town, about the Sabah watergate?

Once a week, there is a water cut lasting three to 12 hours in his residential area. During the previous El Nino season, there were 12-hour water cuts on alternative days for two months.

With the constant water cuts in Tawau, he had to install two 400-gallon stainless steel water tanks and pneumatic water pumps at his home. He also had to install two 100-gallon water tanks and automatic on-off water pumps at the ground floor of his shop and another 400-gallon water tank and pneumatic water pump at the first floor. The total cost is RM16,000.

N.V.H.’s household has never experienced water woes, as supplies from water tanks last for five days.

“What’s your comment on the Sabah watergate?” I asked.

“Of course I’m angry when I come across all these water scandals. But we can’t do anything about it,” he said.

What do we tell M. S., a 47-year-old Bajau Sama managing consultant from Kota Belud, about the Sabah watergate?

The shortage of clean water in his district is unexplainable, he said.

“What’s your comment on the Sabah watergate?” I asked. “There is an abundant water source from Mount Kinabalu, flowing through rivers across Kota Belud. The rivers are full of water yet it has failed to be converted into clean water,” he said.

The water supply covers about 30% of the villages in the district and the rest depend on untreated gravity water.

“Sad to say that some villages have a piping system but no water. The water department implements piping projects in every election. Yet the clean water shortage is here to stay,” he said.

I pray that the MACC’s investigation reaches to the top. And that those who are responsible will pay for their greed.

One man's meat by Philip Golingai The Star/ANN

19 engineers nabbed in probe as graft scandal widens with arrest and seizure in assets across Sabah


(File pix) The Malaysian Anti-Corruption Commission (MACC) has nabbed 19 engineers to facilitate investigations into the Sabah Water Department’s multi-million ringgit graft scandal. Pix by Mohd Adam Arinin ; MACC held a news conference in KK where they announced and displayed a whopping haul of RM114 million worth in cash, jewellery, land grants and branded goods. — Bernama pic

KOTA KINABALU Oct 21 2016:  The Sabah Water Department graft scandal has widened, with the arrest of 19 engineers across the state and the seizure of RM7.8mil in assets, including RM4.2mil cash.

The district or divisional engineers, aged 29 to 59, were detained at 27 locations in the state as the Malaysian Anti-Corruption Commis­sion (MACC) continues its probe.

Its investigations have already implicated top officials in the department in connection with the siphoning of money from RM3.3bil worth of federal allocations for state rural water projects since 2010.

The engineers were remanded for between three and seven days in Kota Kinabalu, Sandakan and Tawau after they were arrested on Wednesday.

Yesterday, MACC deputy commissioner (operations) Datuk Azam Baki said they may have been collecting as much as 27% to 30% in kickbacks from the contracts awarded. But he did not disclose the amounts involved.

He said investigators also seized procurement files and were sifting through the documents.

Asked about speculation on social media that certain top politicians were linked to the scandal, Azam said the probe was focused on civil servants at this point.

“For now our investigations do not involve any political figures in the state or at federal level.

“I am asking people not to politicise the matter and not to take advantage of the investigations for their own interest,” he added.

He said MACC officers were going through the numerous documents in detail before submitting the investigation papers to the Deputy Public Prosecutor.

“We assure everyone that our investigations will be transparent and professional,” he said.

The latest collars were a second wave to the arrests of the two top water department officials and the seizing of more than RM190mil in assets, including RM57mil cash, since Oct 4.

Apart from the officials, who have been suspended by the state government, MACC also nabbed a senior officer’s businessman brother, his accountant and an engineering adviser to the state Finance Ministry. All were released early this week.

The officials were alleged to have abused their powers by awarding contracts to 38 companies owned by their families or cronies, to siphon off the federal funds.

MACC investigators were also looking into suspected money laundering as they try to recover some RM30mil that has been reportedly stashed in overseas accounts. The Star

One more SWD engineer held

An array of cash both ringgit and foreign currency, gold jewellery, land titles and luxury brand watches and handbags were seized from two high ranking Sabah state agency officials in a graft investigation. ― Picture by Julia Chan

KOTA KINABALU Oct 25 2916:  Another district engineer has been arrested in the ongoing massive graft probe into the Sabah Water Department.

The officer, who was arrested at 6.40pm on Sunday, was produced before Tawau magistrate Faizal Che Saad who allowed the Malaysian Anti-Corruption Commission’s (MACC) application for a five-day remand.

Five of the department employees who were among the 19 department staff detained on Oct 19 were released on bail yesterday.

The five were freed on RM50,000 bail each after being produced before magistrate Cindy Mc Juce Balitus at about 2.40pm.

Earlier this month, five suspects, including the department’s director and deputy director, were detained under Ops Water which also saw the seizures of some RM190mil in cash, properties and other valuables.

Also picked up during the second wave of the operation were 22 engineers and technicians, some of whom were said to have received as much as 30% in kickbacks for the water projects.

The investigators seized RM8.4mil in the second phase of their probe.

MACC deputy chief commissioner Datuk Azam Baki confirmed the latest arrest when contacted.

Meanwhile, sources said there was pressure for the investigators to speed up their probe into the case.

“It would take a much longer time to wrap up investigations due to the vast amount of documents involved,” they said, adding that the amount of documents seized was equivalent to “half the size of a tennis court”.

“Due to this, we have to fly in more officers from Putrajaya and several states to Kota Kinabalu to assist in gleaning, sorting out and scrutinising the documents.

“Every piece can provide a vital clue,” one of the sources said.

All the documents – in the millions – are now kept in a secret location here and a team of officers are taking turns to guard them round-the-clock.

“As this is a high-profile case, certain quarters are trying to take advantage of the situation. But the MACC will not allow any outside elements to jeopardise our probe.

“The investigation team is doing its best to come up with an airtight case before submitting the investigation papers to the Attorney-General’s Chambers to press charges against those responsible,” added the source.

The probe is one the biggest ever in the country to be carried out by the MACC involving abuse of power, corruption and money laundering from the RM3.3bil in federal allocations for water since 2010.

Civil service back in vogue - for the wrong reasons



THE civil service may fall short in meeting the job prospects of a large number of people, but it has made up with abundant opportunities for self-enrichment – if one is prepared to take the risk of facing the law.

In a nutshell, the “Watergate” incident involving top officials from the Sabah Water Department is increasingly serving as an eye opener for the majority who had shunned the civil service previously due to limited prospects and lower remuneration compared to the private sector.

As the number of people involved in the “Watergate” discovery keep stacking up, with some junior officers returning money to become state witnesses – the chatter in coffee shops is on the level of abuse within the civil service when it comes to handing out contracts through a restricted tender process.

To be fair, the majority of Malaysia’s 1.2 million-strong civil service are merely ordinary employees providing a service to the public. They carry out their duties diligently despite the constraints and remuneration.

However, there is something wrong with the system when we hear that even basic matters such as the transfer of a student from a mediocre school to a school that is “highly sought after”, or students seeking grants and scholarships from the Government may require some kind of monetary gratification to someone within or outside the system.

Generally, cases involving a small exchange of money go unreported because the party that is prepared to hand out the gratification just wants to go about their business with a minimum of hassle. At most, the topic is fodder for talk among friends or relatives. But when millions are seized from the homes and offices of civil servants – money supposedly meant to upgrade the water services in Sabah – it no longer is merely coffee-shop chatter.

It has been a topic of serious discussion almost everywhere in the last 10 days.

When Budget 2017 is announced next week, the nation will see another round of Government allocation to various ministries for their expenditure and development. In the budget last year, the Federal Government estimated the operating and development expenditure for this year to be RM265.22bil. Generally, the development expenditure is less than RM50bil and the rest goes towards the cost of operating the Federal Government.

While in previous years, the focus was on the Government’s growing operating expenditure, which means less money for development, the question that will be racing on the minds of many is how much of the amount allocated is going to be siphoned off in the form of corruption and kick-backs for inflating the cost of projects and “fixing” restricted tenders.

The Government has limited options in its spending, considering that there is a target to keep the fiscal deficit down. This year, the fiscal deficit is expected to be negative 3.2%, which is a remarkable improvement compared to negative 4.3% in 2012 and a figure of more than negative 5% in 2009.

Next year, we are supposed to bring down the fiscal deficit to 3%, meaning Government spending has to be cut further.

It is part of the plan to have a balanced budget by 2020, which is only four years away. A balanced budget means that what the Federal Government receives in revenue is enough to cover its operating and development expenditure.

Many countries tend to keep a surplus budget, something that comes in handy during bad times. A fiscal surplus effectively means the Government earns more money than it spends. It has reserves that can be touched when it needs to spend more than what it earns. And a fiscal surplus or balanced budget commands the respect of rating agencies.

Earlier this week, Australia’s 30-year debt papers garnered a triple-A rating despite the country going through an economic slowdown due to the fall in the resources sector. The country used to run a surplus budget until 2007.

As for Malaysia, achieving a balanced budget by 2020 is part of a plan to shore up the country’s balance sheet. However, the Government must ensure that the machinery works towards optimising every ringgit spent.

In the case of the Sabah Water Department incident, alleged abuse was allowed to happen due to the practice of having “restricted tenders” when awarding contracts. It is a common practice in all departments and ministries. The only difference is the amount that can be awarded.

For instance, at the ministry level, the level of approval for the minister to award contracts through restricted tenders can go up to RM100mil or more. As long as there are eight to 10 companies that are registered with the ministry competing in the restricted tender exercise, the minister can award the job to the lowest bidder.

The companies tend to act in concert, something that is known to the officers handling the tender process. When the contract is awarded to one company at an inflated price, the other companies get paid for their participation.

The officers in the ministry are also being rewarded and it goes down from the top to several layers down. The restricted tender process can easily be a farce!

The argument that favours a restricted tender is that it can be awarded quickly compared to an open tender, where the evaluation process is often time-consuming. However, a competitive open tender process allows for an efficient price-discovery mechanism.

For instance, the 1,000MW Prai power plant in Seberang Perai was awarded on a competitive tender. The winning bid came in on a tariff of 34.7 sen per unit, which is now the benchmark for any future gas-fired power plants.

Restricted tenders have been quite prevalent in the past few years. However, they have a massive amount of drawbacks, based on the rising number of civil servants being charged or under investigation for corruption.

However, the restricted tender process has brought back the allure of the civil service – for the wrong reasons though.

There was a time in the 1960s and 1970s when civil servants were the preferred choice of grooms in arranged marriages. It was apparent especially among Indian parents.

From the mid-80s onwards, the shift was towards those working in the private sector, especially prospective grooms in large multinational companies holding mid-management positions.

Now, the civil service sector is back in vogue – especially positions that involve the awarding of contracts. All thanks to the enormous publicity that “Watergate” has drawn.

- The alternative view by M. Shangmugam, The Star/ANN

Related articles:

Adviser nabbed in Ops Water investigation

KOTA KINABALU: A Sabah Finance Ministry adviser has been arrested in the on-going probe into abuse of power and corruption at the Sabah Water Department (SWD).

Related posts:


https://youtu.be/01stOYgM9x0 It was a record haul by the Malaysian Anti-Corruption Commission – RM114mil seized from two top officer... 
Jabatan Air Negeri Sabah - http://malaysianlogo.blogspot.my/2014/06/jabatan-air-negeri-sabah-sabah.html KOTA KINABALU: Everywhere in Sab...

 
  Jabatan Air Negeri - Customer Service How the millions were stolen? 1. Contracts broken down to small packages of RM100,000 ea...

 
Water Corruption | SSWM http://www.sswm.info/content/water-corruption The Star Says: A crisis of integrity and a lesson to be learnt ...


The Malaysian government can make further spending cuts if it reduces the size of its “bloated” civil service, an economist said. File pictu... 
 

Malaysia world's No.1 highest civil servants-to-population ratio! Its tenure of service legally vulnerable but notoriously difficult to dismiss!

Saturday, July 18, 2015

Harness STEM for engineering


https://blogger.googleusercontent.com/img/b/R29vZ2xl/AVvXsEgWrXYEmMBPZgPLv-a55A-5-x81IykLMSuGrq-N7b4kNA7Yt71Rgi-PecTkNScy5qicATKrVsHqe4ZSsQof82QWaeeSuf72LDrJEHapb0YqvKGyfaHoWyLHCfW50ZIdikIAmjkuYUFeOduS/s1600/IEM1.jpgDATUK IR. LIM CHOW HOCK President The Institution of Engineers, Malaysia

AS Malaysia gears up to developed nation status by 2020, there is still much to do to get there.

One of the most direct ways to arrive at the vision is to ensure a sufficient and growing number of engineers.

Increase in the number of engineering students is paramount to meet the nation’s need for engineers who would implement and maintain the many economic development projects.

During his visit to the International Bureau of Education (IBE) in Geneva in April, Deputy Prime Minister Tan Sri Muhyiddin Yassin spoke of the need for Malaysia to harness skills and knowledge in Science, Technology, Engineering and Mathematics (STEM).

Muhyiddin also pointed out that the countries which started on the same level as Malaysia had moved much further ahead, crediting it to their wisdom in making full use of STEM to boost their country’s fortunes.

As such, he emphasised the need for human capital development in STEM, which he considers vital in the national transformation process.

To achieve this, a strategy comprising a series of actionable plans must be able to support the production rates needed for generating skilled STEM human capital at two levels, namely secondary schools and tertiary institutions, to reach the target of 500,000 STEM graduates by 2020, according to Muhyiddin.

Although the solution is apparent, its execution remains challenging.

One of the factors hindering this step to greater national development is getting students to love science, or science classes. Science and mathematics as school subjects must be made interesting, easy to understand, as well as more hands-on and exploratory. This is in line with the Government’s aim for 60% science and technology-based education by 2020.

For the engineering profession, interest in science, technology, engineering and mathematics in school will result in more qualified students who are eligible to pursue engineering courses in universities.

Through the increase in engineering students, the nation’s need for engineers would be met. This would translate into greater implementation and maintenance of the country’s economic development projects.

The Institution of Engineers Malaysia (IEM) lauds the Government’s effort to promote interest among students to study science in schools.

Without the large number of science students, there will surely be a corresponding limitation in the ability of universities to produce the number of engineers needed.

As a national association with the nation’s interests at heart, IEM has been actively involved in conducting school career awareness talks, arranging competitions and exhibiting interesting projects on engineering to school children to promote interest in engineering. IEM has also set up IEM Student to encourage students to choose sections in various universities in Malaysia.

Engineering students are also encouraged to join IEM as Student Members which will enable them to access IEM resources and activities such as talks and networking. IEM is one of the supporting members (together with AAET, MiGHT, Utar and NSC) for the Kuala Lumpur Engineering Science Fair, an annual programme to promote interest in STEM among primary and secondary school pupils.

We believe that career prospects will be a major factor in the students’ decision in their studies and career options.

Prospects for engineers include top level positions, attractive remuneration as well as status recognition, which will be a great motivation for students to take up STEM Education and thus pursue a career in engineering.

Students must be made aware that job prospects for engineering graduates remain bright as Government allocation for infrastructure development has supported the demand for engineers.

National development towards an industrial nation has also spurred the demand for engineers.

Students, and parents too, must realise that a career in engineering is not only limited to the five traditional branches of engineering, namely Civil, Mechanical, Electrical, Electronic and Chemical Engineering. Through the years, engineering has expanded into many new disciplines such as Aeronautical Engineering, Environmental Engineering, Maritime Engineering, Mining Engineering, Oil and Gas Engineering, among many others, which would be exciting career options for students.

The Government being the largest employer should provide equal opportunity and create a structured pathway for all science-based professionals, in particular engineers, to take up high positions in the civil service.

Recognition of the contribution of engineering success and seeing it as a pathway to top positions in the civil service will be a great motivator for students to pursue STEM education in Malaysia.


Related posts:

 
15 May 2015
However, in 2009, IEM further amended the constitution to allow only graduate members and corporate members, who are not professional engineers, to use the title “Engr” before their names. This will ... In so far as the approving authorities are concerned, the title “Engr” does not pose any confusion because all submission of plans need to have the stamp of a professional engineer (P.Eng.) with the title “Ir” as required by the Board of Engineers Malaysia (BEM).

 
It is necessary for the nation to embrace Stem education in order to reach new heights. IT is imperative that schools and educational …

IN our previous article (Stem education for life to reach new heights) we talked about the engineering feats of the 20th century, what STEM (Science, Technology, Engineering and Mathematics) stands for and some ways to...

Stem education for life to reach new heights

 Success factors: higher education, right skills and knowledge 

Friday, May 15, 2015

Getting titles right in the engineering field in Malaysia

RECENTLY, the Institution of Engineers Malaysia (IEM) received an enquiry on the usage of the title “Engr.” for members of the institution.

http://www.myiem.org.my/default.aspx?redirect=oldsite

The title “Ir” was first introduced by IEM in the early 1970s for both the graduate and corporate members of the Institution. The amendment to the Registration of Engineers Act in 1987 provided for the use of the title “Ir” to registered professional engineers only.

With this development, IEM had to amend its constitution to disallow the use of the said title. Hence, the title “Ir” which once signified the membership of the Institution was taken away.

Since then, IEM has strongly felt that there was a need to provide an identity for the members of the Institution. Many suggestions and calls were made for the institution to look into the issue of a suitable title for its graduate and corporate members who are qualified engineers with accredited and recognised engineering degrees.

Therefore in 2006, the use of the pre-nominal “Engr” for the graduate and corporate members was introduced with the aim of not only giving due recognition and honour to the engineers, but also encouraging the younger generation to take up engineering.

However, in 2009, IEM further amended the constitution to allow only graduate members and corporate members, who are not professional engineers, to use the title “Engr” before their names. This will clearly distinguish between the title “Ir” for professional engineers and “Engr” for IEM members who are not professional engineers.

Moreover, the usage of the title “Engr” shall be used in conjunction with the post-nominal of “FIEM”, “MIEM” or “Grad IEM”, whichever is appropriate. As such, the use of pre-nominal “Engr” shall not be construed to imply that the person is a professional engineer.

With the progress of society and the Government’s aspiration for Malaysia to achieve the status of a developed nation by 2020, IEM shall always support the Government’s vision to produce more qualified engineers who will play a very important role in nation-building.

IEM graduate members can use the title “Engr” with pride and confidence as their degrees have been vetted and recognised by the Institution.

The admission as graduate members of IEM is only accorded to the holders of engineering degrees accredited under the Washington Accord. In so far as the approving authorities are concerned, the title “Engr” does not pose any confusion because all submission of plans need to have the stamp of a professional engineer (P.Eng.) with the title “Ir” as required by the Board of Engineers Malaysia (BEM).



“Engr” is now a title where members of the institution who are not professional engineers can be addressed.

This will give high recognition and honour to the engineers and promote the growth of the engineering profession for the progress of the nation.

Currently, there are more than 10,500 members of IEM who are entitled to use the title “Engr”

By IR YAM TEONG SIAN Secretary Institution of Engineers, Malaysia

Related:

Good practice at construction site  - IEM


Report on collapses ready 

THE open investigation into two civil structures that collapsed in June 2013 has been completed and the report submitted to the Penang government, said Chief Minister Lim Guan Eng.

 
Related posts:
 
Building structural integrity & failure: problems, inspections, damages, defects, testing, diagnosis, repair. Structural ... Structural Defect Recognition, Repair, Prevention for Building Structures, & Building Structural Failures.

Reponsible housing developers' traits and qualiies expected

Who is responsible: developer, contractor, local council or house-owner for the damages? 
  Who is responsible for slope management? Does the responsibility come with the property bought by the purchaser? THE collapse of a...
 

  House buyers, learn your rights
House buyers, learn your rights. I RECENTLY moved into our new house in Sungai Ramal Dalam. I bought the property back in 2012 and we received t



I REFER to the article “Local govt polls may cause racial polarisation” ( Sunday Star, Jan 25) and would like to share my views on matters. ...